DV01 and CS01DV01

DV01 is the money gained or lost on a bond position if yields move by one basis point (0.01%). CS01 is the same idea for a one-basis-point change in the credit spread. Traders use them to size and hedge interest-rate and credit risk.

Duration expresses rate risk as a percentage. Traders often prefer money: how many dollars does this position make or lose if yields move by one basis point? That is DV01. CS01 does the same for credit spreads. Because they are in money terms, they can be added across positions and used to size hedges precisely. This entry explains both measures with simple examples.

Category
Bonds and Interest Rates
Reading time
4 min
Also called
Dollar value of a basis point, Basis point value, Spread duration value
Updated

DV01 and CS01 in plain words

Duration measures how much a bond’s value is likely to change when rates move; higher duration means more sensitivity.1 DV01 turns that into money for a one-basis-point (0.01%) move. See Duration.

A quick formula: DV01 ≈ duration × market value × 0.0001. Because prices and yields move in opposite directions, a rise in yields means a loss of about DV01 per basis point for a long position.2

How to use DV01, step by step

  1. Find duration and market value

    For each position.

  2. Calculate DV01

    Duration × market value × 0.0001.

  3. Add across positions

    Longs and shorts offset in money terms.

  4. Scale to a move

    Loss ≈ DV01 × basis-point change in yield.

  5. Hedge

    Choose a hedge size with an equal and opposite DV01. See Hedging.

  6. Do the same for spreads

    CS01 for credit spread moves. See Credit Spread.

Worked examples

Example 1 — DV01 of a position

Rate risk

A $2 million bond position with a duration of 7.

Example 1 — DV01 of a position — calculation
DV017 × $2,000,000 × 0.0001 = $1,400
Yields rise 25 bp≈ −$35,000

DV01 turns duration into money per basis point.

Example 2 — Sizing a hedge

Hedge

A portfolio has a DV01 of $1,400. A hedge instrument has a DV01 of $70 per contract (short position gains when yields rise).

Example 2 — Sizing a hedge — calculation
Contracts to short$1,400 ÷ $70 = 20

Matching DV01 neutralises small parallel rate moves.

Example 3 — CS01

Credit risk

A $1 million corporate bond with a spread duration of 5. Its credit spread widens by 40 bp.

Example 3 — CS01 — calculation
CS015 × $1,000,000 × 0.0001 = $500
Loss from spread widening40 × $500 = $20,000

CS01 isolates credit risk from interest-rate risk.

Rate-risk measures

AspectUnitBest for
Duration% price change per 1% yield moveComparing bonds
DV01Money per 0.01% yield moveSizing and hedging positions
CS01Money per 0.01% spread moveCredit risk
ConvexityCurvatureLarge moves. See Convexity

Where traders use them

  • Risk limits

    Desks often set limits in DV01.

  • Hedging

    Offsetting rate risk with futures or swaps.

  • Relative-value trades

    Balancing positions so only the spread matters.

  • Credit portfolios

    Separating rate and credit risk.

Advantages and disadvantages

Advantages

  • Expressed in money, so it adds across positions.
  • Ideal for sizing hedges.
  • Separates rate (DV01) and credit (CS01) risk.

Disadvantages

  • Linear approximation; less accurate for big moves.
  • Assumes parallel yield moves unless split by maturity.
  • Changes as positions and yields change.

Going deeper

Read as far as you need. Each level builds on the one before it.

A basis point

Beginner

One basis point is 0.01 percentage points. A move from 4.00% to 4.25% is 25 basis points.

Key-rate DV01

Intermediate

Splitting DV01 by maturity shows exposure to different parts of the yield curve, useful when curves twist. See 2s10s Spread.

Hedge drift

Advanced

As yields move, durations change, so a DV01-matched hedge drifts and must be rebalanced.

Common mistakes

  1. Mixing percentages and basis points

    1 bp = 0.01%.

  2. Ignoring signs

    Long bonds lose when yields rise.

  3. Hedging once and forgetting

    Rebalance as DV01 changes.

  4. Using DV01 for very large moves

    Add convexity.

Check your understanding

Test yourself before moving on. Each answer comes with an explanation.

Q1Duration 4, market value $5,000,000. What is the DV01?
Q2DV01 $2,000; yields rise 15 bp. Approximate change for a long position?

Key points to remember

  1. DV01 = money change per 1 bp yield move.
  2. DV01 ≈ duration × market value × 0.0001.
  3. CS01 = money change per 1 bp spread move.
  4. Both add across positions and size hedges.
  5. They are approximations that change over time.

Frequently asked questions

What is the difference between DV01 and duration?

Duration is a percentage sensitivity; DV01 is the same sensitivity in money for a one-basis-point move.

Is PV01 the same as DV01?

They are closely related terms for the value change per basis point and are often used interchangeably.

Why do traders prefer DV01?

Because money amounts can be added across positions and used directly to size hedges.

Further learning

Sources

This article is written in our own words. The sources below support the specific facts, rules and figures marked with a number in the text. Links open the original publisher’s page.

  1. FINRA. Brush Up on Bonds: Interest Rate Changes and Duration (opens in a new tab) Checked .
  2. Investor.gov (SEC). Investor Bulletin: Fixed Income Investments — When Interest Rates Go Up, Prices of Fixed-Rate Bonds Fall (opens in a new tab) Checked .

Educational content, not financial advice. Examples use hypothetical prices and simplified costs; actual fees, margin rules and regulations vary by broker, market and country. We are not affiliated with any publisher linked above. Last reviewed . Report an error or request a source credit.